Saturday, 29 December 2012

100 Day Hustle Crumble



When the 100 Day Hustle commenced at Kelsey Sews I missed the sign up but I kind of played along anyway. And considering that in these past 100 days we have purged, packed, moved and almost unpacked a whole house, I don't consider my effort too shabby!

Must Dos

Passport Cover
Rather than make one, I ended up using the Zakka Style Zip Pouch Organiser for this instead. It was perfect for the job (despite my Passport last minute panic) when we cruised in late October.

Say Cheese! Polaroid Block Swap
Done. Swapped and now I need to make a few kiddy cushions with my blocks.

QCA Bee#1



I managed to get October and November blocks done but not December as yet.



Wombat Stew Blocks

I did Jane's house block in October and Kristy's sewing block in November.

Mystery Quilt Back

I managed to finish the back of this quilt BEFORE we moved but decided to give the Preschool director a previously finished table runner instead. In fact all of the Preschool staff got a home made quilted project from my stash. It was great to pass things on instead of storing them away unused.

Like to Do

I actually got some of these finished!

4 Liberty Pillow Cases

Sadly not done for 2 reasons. I find I am short on material to finish four using the burrito style tutorial. Also the elderly recipient, Jean, broke her leg about 3 months ago and has been in hospital for the majority of that time. It has been very tough for her and her husband. I hope to get them done early in 2013.

6 Halloween Pillow Cases


Katie Jump Kites

A wonderful finish. This is a quilt that brightens my every day.


Little Stitches Embroidery



I managed to turn the snow globe design into a Christmas tree decoration.

Hope to Do

Sherbert Dreams Quilt

I have still HAVE NOT started this quilt. Finger's crossed for the last 2 days of 2012! I may use Aneela Hooey's NEW Posy line for this one now. Or even a combination of her designs.


Tall Boy Runner and Nesting Box

Now that we have moved house I would love to get stuck into this project. The top of the tall boy is very empty for now. 


Did Not Plan to Do

Aw these were all fun to do even though they were not on my planned list of things to make in the 100 days.

Two Purses for Two Wombats




Teaching my Son Embroidery





So how did you fare on the 100 Day Hustle?  Next year there are 365 days to get it all done!




5 comments:

  1. Congrats from a fellow hustler :) Great job and Happy New Year!

    ReplyDelete
  2. i love that quilt finish! (brights on grey) congratulations!

    ReplyDelete
  3. I can't believe how much you got done. Oh wait, yes I can. You are amazing.

    ReplyDelete
  4. Love your purses, they are adorable and I hope well used. C0ngratulations.

    ReplyDelete
  5. The Katie Jump Kites quilt is so pretty. You really got a lot done!

    ReplyDelete

Note: only a member of this blog may post a comment.