Showing posts with label Pre-Kindy Quilt. Show all posts
Showing posts with label Pre-Kindy Quilt. Show all posts

Wednesday, 1 February 2012

'Little Girls' Quilt - Just in time

I used to work to deadlines in my BC (before children) life. As well as the teaching ones,  I also had University ones. Essays that had to be handed in after pulling very late nights. Some of those memories came back as I had to finish this quilt for my daughter's first day in Pre-Kindy this week. Even though I have been working on it pretty solidly for the past week, there was so much to 'get done' today.

I zig-zag stitched around the perimeter of the quilt and then cut off the excess backing and batting. It was a hot day, so I didn't want to have a lot of fabric in my lap....

or under the arm of my machine!

Then I chose a light pink cotton and a walking foot, I shadowed the ditch with my quilting. I managed to watch most of the 5th Season of 'The Wire'.

After dinner I had to choose a binding fabric from out of the 'Summer Song' Riley Blake range. Any of the prints would have worked but I chose the stripes. I wanted to cut on the bias to capitalise on the stripes staying vertical. I did not have a large pice of fabric, just under a yard, but then I remembered a MSQC tutorial on binding using only half a yard. I watched it a few times, before marking and sewing the 'tube'. 

I was getting tired by this point and the first result was out by about 1/4 inch, so I unpicked and restitched, until all the lines matched perfectly.
Then I cut along the straight lines with my fabric scissors...
I pressed in half until I had over 200" of binding (width 2 1/4")
Then sewed the binding to the front and then pressed it to the back and sewed again on the front 'in the ditch'. Did the little 'joining the ends' trick, for the first time, without consulting the tutorial.
I was horrified to find the clock face at 12:45am!

'Little Girls' Pre-Kindy quilt
Quilting detail
The back - using the left-over half-square triangles (HS)



The binding looks like retro lollies
I feel like I pulled an all-nighter. Now I am exhausted. But I got it done just in time and my little girl got to take it to Pre-Kindy.





Thursday, 26 January 2012

WIP - Pre-Kindy Quilt

Work-in-Progress Tally

1. dolly quilt #1 -  need to add border
2. dolly quilt #2 - same
3. dolly quilt #3 - same

I normally operate under the guideline of "not starting a new project until the last is completed". It works well for me (I do the same with reading books) and I don't have many WIPs lying around. But I needed to leave last week's Dolly Quilts project completion for an important deadline.

New WIP - Pre-Kindy Quilt

My daughter, Frances,  just turned 4 this month. Next week she starts 2 days a week of Pre-Kindy at my sons' school. They have a compulsory 'seista' where they pull out the mats and the room is darkened. We have to supply a fitted cot sheet set but I wanted to send along a little quilt as well.
Fran wearing my pumpkin tea pot cosy
My mum made her this gorgeous 'Apple Blossom Fairies' quilt for Family Day Care, but it is too gorgeous to send. Besides, I'd like to work out how to add a mounting sleeve and then hang on her wall.
I bought a panel of 'Little Girls' last year and Sandi from Crafty Lady helped me to choose some co-ordinating fabrics. She has a gift!
I used some of them to make a 'Flood Quilt' to donate in 2011. 
'Little Girl' Flood Quilt
I must have started cutting the fabric to match the 'little girls' squares because I found a pile.
This would have been great had I stuck to the original plan of using just 6" squares to make a quilt. However I got this great book by Sweetwater Design  for Christmas and found a gorgeous pattern for a Family Room Quilt. So in keeping with goal #3 in the 2012 Challenge to Myself  I decided to try this instead.


But the pattern called for a packet of layer cakes (10" precut squares). As I had already cut some fabric down to 6" squares, I needed to modify my pattern. 


I cut 12" x 6" rectangles from the uncut fabric and used the 6" squares to cut in half for the triangles. Not too difficult. Getting the colour combination right was a little tricky.




This Thursday 26th January is a national 'Australia Day' holiday, and my husband is making it a long long weekend by taking Friday off. We currently have a low pressure system sitting over the north coast bringing us flooding rains. So those factors should combine to give me some time to add borders, baste, quilt and bind before next Wednesday when Fran starts. Fingers crossed!


Fran was kind enough to put Dr Ted to bed this evening...