Showing posts with label Little Girls. Show all posts
Showing posts with label Little Girls. Show all posts

Thursday, 1 March 2012

February Finishes

Thanks to Kristy from Quiet Play, and Mosiac Maker, I was able to come up with a mosiac of the finishes I had this month. It's nice to look at these and feel a sense of accomplishment for a month of long lasting work - unlike housework and cooking.

So here they are L to R, Top to Bottom

1. Scrap Bag log cabin bedside table mat - for him
2. Scrap Bag log cabin bedside table mat - for her
3. Scrap Bag stacked coin dresser runner - for the master bedroom
4. Sweetwater Designs notebook cover - for my 'To Do' book
5. Notebook cover - for my Finances/Budget book
6. Craftsy Feb. BoM 'Balkan Puzzle'
7. Craftsy Feb. BoM 'Chunky Chevron' 
8. 30 mini activity bags - for the Pre-Kindy
9. 6 QCA Bee Feb. scrappy log cabin blocks
10. 'Little Girls' Pre-Kindy seista quilt - for my daughter
11. 'Little Girls' Pre-Kindy seista quilt (back) 
12. 5 extra QCA Bee Feb. scrappy log cabin blocks

After making many things for others in 2011, there's been some nice projects that will benefit my family and I for a change.


To Do First in March



1. Quilt Club Australia QCA Bee March 'Garden Gate' blocks
2. Crafsy BoM for March - I hear rumour that there might be a string block
3. QCA Bee Feb. Scrappy Log Cabin - sew blocks together, baste, quilt and bind
4. Quilt dolly quilts #2 and #3
5. Baste and quilt dolly quilt #1
6. Baste and quilt Far Far Away #2/3 'Fussy Fairytales' quilt top
7. Finish notebook cover #3 for my friend's birthday - due Fri March 9th
8. Sew a cover for my Janome sewing machine
9. Sew a cover for my overlocker.

That should be enough I think. I don't my commissioned quilt customer from Feb. is going to follow up so I will have more time.

I am linking up with To Do First at Lawson and Lotti. It sounds like she is moving to Australia from England - better warn her to bring her wellies and mac - we call them gumboots and raincoats here. 

Thursday, 26 January 2012

WIP - Pre-Kindy Quilt

Work-in-Progress Tally

1. dolly quilt #1 -  need to add border
2. dolly quilt #2 - same
3. dolly quilt #3 - same

I normally operate under the guideline of "not starting a new project until the last is completed". It works well for me (I do the same with reading books) and I don't have many WIPs lying around. But I needed to leave last week's Dolly Quilts project completion for an important deadline.

New WIP - Pre-Kindy Quilt

My daughter, Frances,  just turned 4 this month. Next week she starts 2 days a week of Pre-Kindy at my sons' school. They have a compulsory 'seista' where they pull out the mats and the room is darkened. We have to supply a fitted cot sheet set but I wanted to send along a little quilt as well.
Fran wearing my pumpkin tea pot cosy
My mum made her this gorgeous 'Apple Blossom Fairies' quilt for Family Day Care, but it is too gorgeous to send. Besides, I'd like to work out how to add a mounting sleeve and then hang on her wall.
I bought a panel of 'Little Girls' last year and Sandi from Crafty Lady helped me to choose some co-ordinating fabrics. She has a gift!
I used some of them to make a 'Flood Quilt' to donate in 2011. 
'Little Girl' Flood Quilt
I must have started cutting the fabric to match the 'little girls' squares because I found a pile.
This would have been great had I stuck to the original plan of using just 6" squares to make a quilt. However I got this great book by Sweetwater Design  for Christmas and found a gorgeous pattern for a Family Room Quilt. So in keeping with goal #3 in the 2012 Challenge to Myself  I decided to try this instead.


But the pattern called for a packet of layer cakes (10" precut squares). As I had already cut some fabric down to 6" squares, I needed to modify my pattern. 


I cut 12" x 6" rectangles from the uncut fabric and used the 6" squares to cut in half for the triangles. Not too difficult. Getting the colour combination right was a little tricky.




This Thursday 26th January is a national 'Australia Day' holiday, and my husband is making it a long long weekend by taking Friday off. We currently have a low pressure system sitting over the north coast bringing us flooding rains. So those factors should combine to give me some time to add borders, baste, quilt and bind before next Wednesday when Fran starts. Fingers crossed!


Fran was kind enough to put Dr Ted to bed this evening...